SOLUTIONS
![](https://static.wixstatic.com/media/d524d9_651e1d3225bd4663bf2dbd1491b3a894~mv2.png/v1/crop/x_0,y_358,w_1500,h_832/fill/w_766,h_425,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/d524d9_651e1d3225bd4663bf2dbd1491b3a894~mv2.png)
As a new product offering, we now offer spare parts solutions for the MWM TCG2016 & TCG2020 gas engines. These parts consist of consumables, maintenance packages, overhaul components as well as upgrade parts designed by PowerUP. These upgraded parts resolve issues with OEM component reliability and performance on MWM gas engines for all gas types.
​
Pictured above is an example of the PowerUP cylinder head designed to deliver a long life and which are fully retrofittable on MWM TCG2016 & TCG2020 gas engines.
Technical Applications/Sales
With over 20 years of experience in the application of gas engines for power generation, our expertise has been employed on such projects as:
-
34 MW CHP biogas project at the largest waste water treatment plant in North America
-
4 MW CHP project at a US Military Base for improved power resiliency
-
Switch gear lineup for a 6 MW microgrid project at a US Military Base
-
2.5 MW CHP project at a US Military installation including the complete supply of BOP scope items needed for a fully functioning power plant.
-
1.5 MW CHP project in Mexico in a municipal WWTP.
![IMG_4016.JPG](https://static.wixstatic.com/media/d524d9_c84a1f2fa9804eb4bd747d5cbfa00788~mv2.jpg/v1/fill/w_412,h_411,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_4016_JPG.jpg)